Category: 2026 Education
Entry ID: 1791
Project Strategy
In collaboration with our general contracting partner, RENU Contracting, we transformed Connetquot High School’s aging pool into a modern, efficient, and visually striking aquatic facility. Working closely with JAG Architects and Connetquot High School, we helped deliver an updated and highly functional design, highlighted by the strategic use of the school’s signature red to create a bold and dynamic visual impact.
The pool deck was constructed using Mapei’s premium tile setting materials and required extensive planning and precise layout to achieve accurate pitching while incorporating a distinctive custom mosaic border by Daltile. In addition to the pool deck, we installed new ceramic tile throughout the natatorium and provided new ceramic wall tile in the shower areas, completing a comprehensive renovation of the space.
To further enhance durability and performance, we also installed epoxy flooring in the showers, locker rooms, and seating areas, resulting in a cohesive, long-lasting, and fully revitalized facility.