Project Strategy
The existing sanctuary and main entrance were remodeled as part of this project. The original pews were removed and donated to local churches, and the congregation selected new seating for the space. Tarkett Powerbond was installed in the pulpit area, while carpet tile was used throughout the sanctuary floor. Upholstered steps were finished with carpet tile and rubber stair nosings for added safety and durability. The entire project was completed within a six-week timeline.
Single Source Interior Contractor Award Strategy
We presented three flooring options for the church, each offering both broadloom and carpet tile selections. To help with visualization, we provided renderings of the carpet choices using photographs from the sanctuary.
The church selected their paint colors and chair fabric based on the colorways chosen from the carpet options. Our scope of work included removal of the existing pews, demolition, and disposal of the existing flooring.
Notably, our primary contact at the church shared that we were the only subcontractor involved in the renovation who did not require follow-up or oversight, reflecting the quality, reliability, and professionalism of our work.