Project Strategy
It was an exciting experience to work on this exemplary design from DMR architects and to deliver a flawless installation. It was a true partnership between Tarkett local Rep Karen Levey-Lynch and Resource New Jersey. The key component to the success of this project was the complex design and material selection of the Tarkett Contour LVT with a 32-mil wear layer and a 25-year warranty.
Designed to replicate the original natural marble extensive pattern work, the Tarkett LVT provides minimum maintenance and meets the overall construction renovation budget of the Church. The complex design layout was handled by Tarkett Imaginations Custom Floor Design Program, which masterfully helps with design, layout plans, CAD programming, CNC cutting, documentation for sequenced installation, and packaging and shipment.
Re:Source New Jersey's team of expert in-house INSTALL certified installers, were fully spirited and handled the installation with the highest expertise. The outcome showcased the truly exceptional design, project management, and installation. We are grateful to have been included in the collaborated efforts including DMR, Tarkett, J.R. Prisco, and Father Antonio at Holy Trinity Church.
Unique Installation Challenge Strategy
As they say, pictures are worth a thousand words; please see the extensive Tarkett LVT pattern design and successful installation showcasing Tarkett's LVT flooring used to replicate the The1900's-built Church's natural marble, and extensive pattern layout throughout the church. The complexity of design was coordinated between Tarkett's Imaginations Custom Floor Design team, DMR Architect with input and collaboration from Tarkett's local rep, and the ReSource New Jersey team, on product selection, sampling for approvals, availability and lead times and labor scheduling requirements.
As professionals, we all manage the normal pressures of General Contractor scheduling. However, this project added additional pressure to meet Father Antonio's request for Christmas Services, requiring all parties to expedite the planning and execution of this complex design installation. The Re:Source team and our INSTALL Certified installers were up to the task, and finished this complex project on schedule. After all, who wants to disappoint the big guy.