P-1130 1ST Marine Division, Camp Pendleton
San Diego, CA
Category: 2024 Mixed–Use Developments, Unique Installation Challenge
Silver Winner Mixed-Use Developments
Architect: Navfac
Starnet Member:
Workplace Services, Inc.
Starnet Preferred Vendors:
Schönox, Mannington Commercial, Daltile, Mannington Commercial Carpet, Roppe, Measure Square Corporation, Spec-ID, Wagner Meters
Project Strategy
This Naval Facilities Engineering Command project, included Administrative Facilities and Service Buildings.
The project was a two-phase, design-build delivery method for Division Command Post Headquarters and a Battalion Command Post Headquarters in a confidential area of Marine Corps Base Camp Pendleton, 1st Marine Division (1st MARDIV). This project consists of multiple buildings with concrete masonry unit walls, reinforced concrete foundations and floors, and standing seam metal roofs. The Command Posts provide the necessary administrative space to conduct the day-to-day operations for 1st MARDIV including vaults, print stations, conference rooms, break rooms, storage areas, reception areas, map room, operations room, server room, Navy Marine Corps Internet (NMCI) closets, and vaults for the Secret Internet Protocol Router Network (SIPRNET) as well as weapons storage.
The project includes cybersecurity features in accordance with current Department of Defense (DoD) criteria and Anti-Terrorism/Force Protection (AT/FP) features. Built-in equipment includes a passenger elevator, building emergency generators and vault.
DoD and Department of the Navy (DON) principles for high performance and sustainable building requirements was included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development was also included in the design and construction of the project.
The flooring design accommodated both heavy traffic resilient areas and softer flooring in office and conference spaces. The design being both functional and honoring our U.S. military.
Unique Installation Challenge Strategy
The project was awarded to Workplace Services based on several factors: Technical Approach, Experience, Past Performance, Safety, Technical Solution, Small Business Participation and Price. The challenges of site logistics, use of sustainability and US made products were all project goals that were reached.