Project Strategy
In the Clean Room (spanning 21,500 square feet), the team got to work, tackling the high spots by grinding them down before giving the surface a thorough bead blasting. The next step was to install the state-of-the-art Koster VAP 1 2000 moisture mitigation system, followed by a self-leveling with Uzin 170. The final touch was the application of Uzin 888, ensuring a smooth and flawless finish.
In the gowning room, BTM installed the stylish Gerflor GTI EL5 CleanTech Square Edge ESD Tiles in a light gray shade (0350) with heat welded joints and a sleek 6” coving system.
For the lab areas, B.T. Mancini finished self-leveling with Uzin 170 before giving the space a polished look with Uzin 888. They also installed Gerflor Mipolam Biocontrol EL-5 ESD Sheet flooring in a subtle light fog shade (2001) with heat welded seams and a smart 6” self-coved installation.
The combination of 360 and 170 was used to correct any low spots in the substrate, while 888 came in handy for filling minor cracks and holes and giving the surface a smooth finish. Finally we capped off the project installing Roppe Standard Base installed throughout.
Unique Installation Challenge Strategy
See design strategy.